HOLE GROUP
  • HOME
  • ABOUT US
  • PRODUCTS & SERVICES
  • GLOBAL OPERATIONS
    • South America
    • Middle East
    • Africa
    • Asia Pacific
    • North America
    • Global Feedback
  • SERVICE ENQUIRIES
  • BRANDS
    • HOLE ENERGY
    • HYDROCARBON OUTSOURCE LIMITED
    • FORGEX PRODUCTION
    • MM Sustainable Foundations
    • Montage Mosaics
    • wHOLE INDUSTRIES
    • ON-TARGET LOGISTICS
    • ON-TARGET TECH
  • TOOL BOX
    • GeneralHSE
    • Excel Assessment
    • HSE-5WHYS
    • PPE Receipt Confirmation
    • Driver Dispatch Confirmation
    • Pre-Employment Screening
    • POSITION ENQUIRY
    • Resource Request
    • CONTINUOUS BASED ASSESMENT
    • REFERENCE CHECK
    • QES Secure Portal Submission
  • AVAILABLE PROFESSIONALS
  • AVAILABLE POSITIONS
  • CLIENT PORTAL
    • HOLE GROUP
    • EOG RESOURCES >
      • VENDORS CODE OF CONDUCT
    • HOLE T&T >
      • HOLE HSE >
        • HSE POLICY STATEMENT
        • HSEMS
      • OUR QUALITY >
        • LEGACY POLICY STATEMENT
        • HOLE QUALITY GUIDE
        • ON-TARGET QUALITY
      • RECRUITMENT >
        • RECRUITMENT POLICY
        • COMPETENCY-MS
      • IMCA-MOC GUIDE IN OFFSHORE ENVIRONMENT
      • CODE OF CONDUCT
      • STOW GUIDANCE
    • BPTT >
      • COMPLIANCE GUIDANCE DOCS >
        • BPTT- SMOKE FREE POLICY
        • GENERAL WORK SCOPE (MSA)
        • SECTION 4 - HSSE_HOLE (MSA)
        • CODE OF CONDUCT
        • STOW GUIDANCE
      • HOLE RFI >
        • ARIBA SUBMISSION
        • HOLE SUBMISSION REVIEW
    • PERENCO TT >
      • CBA-HSE CUSTOM
      • HSE - Candidates
      • HSE Training Matrix
    • REPSOL >
      • HSE POLICIES & PROCEDURES >
        • 7 RULES TO SAVE YOUR LIFE
        • 5.2-01 CONTRACTOR HSE MGT. PROCEDURE
        • 8.43-1-001 PPE PROCEDURE
        • PG-07-01 OPS REQUIREMENTS FOR CONTRACTORS
        • 2.1-001 HSE POLICY
        • 1.0-02 DRUG AND ALCOHOL PROCEDURE
        • 2.9-01 HSE CRANE AND LIFT EQT. OPS AND MTCE PROCEDURE
        • 2.8-01 HSE ROAD TRANSPORT PROCEDURE
        • 5.3-002 HSE INCIDENT REPORTING AND INVESTIGATION PROCEDURE
        • 4.10-01 RISK MANAGEMENT PROCEDURE
        • STOW GUIDANCE
    • X52 ENQUIRY

BOP WEEKLY REPORTING

qa/qc bop maintenace submission form

    ​weekly or post well

    Testing

    Pressure test and operate the preventer every 14 days (You may be able to skip the pressure test before drilling out casing if the BOP stack was not removed, the pressure requirements for the next section are not greater than the previous test, and the time between tests has not exceeded 14 days or 30 days for blind shear rams).
    ​

    Body & bonnet

    Clean the BOP body, bonnet, and rams; remove all traces of well fluids. (weekly or after each well)
    ​

    seals/ threads

    Visually inspect all seal areas, threads, and seals; ensure no debris or damage. (do not use wire brush on sealing areas use 600-800 grit sandpaper)

    hydraulic system

    ​Check for hydraulic leaks at hoses and manifolds; verify accumulator pressure is within range.

    lubrication

    ​Grease and assemble in accordance with the Cameron Technical Manual.

    function testing

    full seal replacement testing / qa/qc

    ​I hereby acknowledge that the information, data, and technical details submitted herein are accurate and true to the best of my knowledge and belief. I affirm that all statements provided have been prepared with due diligence, and any assumptions or interpretations have been made in good faith based on the information available at the time of submission.
Submit
Member Portal
http://www.hole-group.com
  • HOME
  • ABOUT US
  • PRODUCTS & SERVICES
  • GLOBAL OPERATIONS
    • South America
    • Middle East
    • Africa
    • Asia Pacific
    • North America
    • Global Feedback
  • SERVICE ENQUIRIES
  • BRANDS
    • HOLE ENERGY
    • HYDROCARBON OUTSOURCE LIMITED
    • FORGEX PRODUCTION
    • MM Sustainable Foundations
    • Montage Mosaics
    • wHOLE INDUSTRIES
    • ON-TARGET LOGISTICS
    • ON-TARGET TECH
  • TOOL BOX
    • GeneralHSE
    • Excel Assessment
    • HSE-5WHYS
    • PPE Receipt Confirmation
    • Driver Dispatch Confirmation
    • Pre-Employment Screening
    • POSITION ENQUIRY
    • Resource Request
    • CONTINUOUS BASED ASSESMENT
    • REFERENCE CHECK
    • QES Secure Portal Submission
  • AVAILABLE PROFESSIONALS
  • AVAILABLE POSITIONS
  • CLIENT PORTAL
    • HOLE GROUP
    • EOG RESOURCES >
      • VENDORS CODE OF CONDUCT
    • HOLE T&T >
      • HOLE HSE >
        • HSE POLICY STATEMENT
        • HSEMS
      • OUR QUALITY >
        • LEGACY POLICY STATEMENT
        • HOLE QUALITY GUIDE
        • ON-TARGET QUALITY
      • RECRUITMENT >
        • RECRUITMENT POLICY
        • COMPETENCY-MS
      • IMCA-MOC GUIDE IN OFFSHORE ENVIRONMENT
      • CODE OF CONDUCT
      • STOW GUIDANCE
    • BPTT >
      • COMPLIANCE GUIDANCE DOCS >
        • BPTT- SMOKE FREE POLICY
        • GENERAL WORK SCOPE (MSA)
        • SECTION 4 - HSSE_HOLE (MSA)
        • CODE OF CONDUCT
        • STOW GUIDANCE
      • HOLE RFI >
        • ARIBA SUBMISSION
        • HOLE SUBMISSION REVIEW
    • PERENCO TT >
      • CBA-HSE CUSTOM
      • HSE - Candidates
      • HSE Training Matrix
    • REPSOL >
      • HSE POLICIES & PROCEDURES >
        • 7 RULES TO SAVE YOUR LIFE
        • 5.2-01 CONTRACTOR HSE MGT. PROCEDURE
        • 8.43-1-001 PPE PROCEDURE
        • PG-07-01 OPS REQUIREMENTS FOR CONTRACTORS
        • 2.1-001 HSE POLICY
        • 1.0-02 DRUG AND ALCOHOL PROCEDURE
        • 2.9-01 HSE CRANE AND LIFT EQT. OPS AND MTCE PROCEDURE
        • 2.8-01 HSE ROAD TRANSPORT PROCEDURE
        • 5.3-002 HSE INCIDENT REPORTING AND INVESTIGATION PROCEDURE
        • 4.10-01 RISK MANAGEMENT PROCEDURE
        • STOW GUIDANCE
    • X52 ENQUIRY